Alarcón, L F and Ashley, D B (1996) Modeling Project Performance for Decision Making . Journal of Construction Engineering and Management, 122(03), 265–73.

Gibson, G E, McGinnis, C I, Flanigan, W S and Wood, J E (1996) Constructability in Public Sector . Journal of Construction Engineering and Management, 122(03), 274–80.

Gransberg, D D (1996) Optimizing Haul Unit Size and Number Based on Loading Facility Characteristics . Journal of Construction Engineering and Management, 122(03), 248–53.

Hartman, F and Snelgrove, P (1996) Risk Allocation in Lump-Sum Contracts—Concept of Latent Dispute . Journal of Construction Engineering and Management, 122(03), 291–6.

Hastak, M, Halpin, D W and Vanegas, J (1996) COMPASS—New Paradigm for Project Cost Control Strategy and Planning . Journal of Construction Engineering and Management, 122(03), 254–64.

Ioannou, P G and Martinez, J C (1996) Comparison of Construction Alternatives Using Matched Simulation Experiments . Journal of Construction Engineering and Management, 122(03), 231–41.

Lin, K and Haas, C T (1996) An Interactive Planning Environment for Critical Operations . Journal of Construction Engineering and Management, 122(03), 212–22.

Samuels, A F and Bruder, M J (1996) Construction Representative: Scheduling and Cost Management . Journal of Construction Engineering and Management, 122(03), 281–90.

Shohet, I M and Laufer, A (1996) Exterior Cladding Methods: A Technoeconomic Analysis . Journal of Construction Engineering and Management, 122(03), 242–7.

Stager, D K (1996) Organizing and Managing a Finance-Design-Build Project in Turkey: Fourth Roebling Lecture, 1995 . Journal of Construction Engineering and Management, 122(03), 199–204.

Tiong, R L K (1996) CSFs in Competitive Tendering and Negotiation Model for BOT Projects . Journal of Construction Engineering and Management, 122(03), 205–11.

Walker, K K, Schexnayder, C, Mayo, R E and Walsh, K D (1996) Methods and Procedural Considerations in Demolishing Tall Concrete Chimneys . Journal of Construction Engineering and Management, 122(03), 223–30.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1996)122:3(223)
  • Abstract:
    This paper reports on a study of possible demolition methods for tall concrete chimneys. In particular it discusses a case where the adjoining plant functions had to remain fully operational during the demolition process. Therefore, both operational and cost concerns in relation to demolition methods and procedures are discussed. In fact, operational risk factors can be critical in the selection of demolition methods. It was found that when diamond sawing was chosen as the method for demolishing reinforced-concrete structures, the cutting pattern can have a significant impact on project cost.